Photo

Intermediate Distribution Frame of Transmission Equipment
Photo

Photograph of workers at work at the Lagos Central Telegraph Office (Date: 19th May, 1960)
Photo

Colonial Phone Booth At Calabar Museum
Photo

Nigeria National Telex / Gentex Network
Photo

Alcatel Transmission Equipment
Photo

The Engineer explaining a point shortly after the commissioning of the call office and the automatic exchange at Otan Ayegbaju and Ilesa by Hon. Akinfosile (Date: 11th January, 1963)
Photo

Technicians at P and T Training School Oshodi at work. (Date: 20th August, 1956)
Photo

EWSD Switching Equipment
Photo

Photograph of Teleprinter at P and T Training School Oshodi (Date: 29th October, 1959)
Photo

Visit of the Members of Advisory Council to Post and Telegraph Department, Lagos (Date: 29th April, 1959)
Photo

Siemens PDH Transmission Equipment
Photo

EWSD Switching Equipment
Photo

Digital Main Distribution Frame
Photo

EWSD Switching Equipment (Second Photo)
Photo

The Prime Minister, Sir Tafawa Balewa at his residence, making inaugural call during the official commissioning of telephone link between Nigeria and Togo (Date: 4th September, 1962)
Photo

Typical 17KVA Generator Set for a Repeater Station
Photo

P and T Telephone Operator at work (Date: 4/2/1958)
Photo

Oki Transmission Equipment
Photo


The old telecommunication wires used to provide telephony services to Nigerian users in the 1980's and 1990's. These wires have now been replaced with wireless connections to base stations, nationwide.
Photo

Sir. James Robertson (Left) and Dr. K. O. Mbadiwe shortly after the official commissioning of an exchange (Date: 20/4/1956)
Photo

Technician at work at P and T Technical Training School Oshodi (Date: 20th August, 1956)
Photo

Oscilloscope (Transmission Measuring Equipment)